Home
Detailed Search
Your proposal for improving our märklin database
Add or Overwrite the existing data and press 'SAVE MY PROPOSAL' in bottom left corner
Please be free to do all changes that you consider is needed.
MRW PHOTO
MÄRKLIN PHOTO_update
If not correct - replace the link in the below field with the correct link to the photo on www.maerklin.de
Märklin No
Märklin Article Name
Last märklin Price(RRP) Year
Last märklin € Price(RRP)
KOLL Price Book Year
KOLL € Value Estimate
Catalog Year(s)
Railway Company
Nationality
Era
Locomotive and/or Car Numbers
Text on Locomotive or Cars
Scale
Housing
Colour(s)
Length
Minimum radius
Couplers
Technology
Light
URL to www.maerklin.de
Notes
Class 08 Steam Locomotive Class 08 heavy express steam locomotive with a powdered coal tender based on the type 2´2´T34. Version as an experimental locomotive with powdered coal firing for the GDR German State Railroad (DR/DDR). Locomotive road number 08 1001. The locomotive looks as it did in the Mid-Fifties. Source: www.maerklin.de After the end of World War II, the GDR German State Railroad (DR) found it had a foreign locomotive of French origin with the SNCF road number 241 A 21. As a development of the French East Railroad (EST), it came from a series of 40 units built in 1931/32 and it had four-cylinder compound running gear. Due to the excessively high repair cost, there was little effort by the DR to put French design locomotives back into operation. Yet the Powdered Coal Collective around Hans Wendler and Max Baumberg, the future director of the Vehicle and Experimental Institute (FVA) in Halle (starting in 1960 VES-M Halle), were able to requisition this express locomotive for their needs due to its special design. With its 12.25 cubic meter / 432.60 cubic foot combustion area and the 2,248 mm / 88-1/2 inch long combustion chamber it was ideally suited for conversion to powdered coal firing, since for powdered coal firing this gave it a desirably long burnout path for the powdered particles. Road number 241 A 21 thus stayed starting September 17, 1951 at the October 7th maintenance facility in Zwickau and was equipped with Wendler powdered coal firing accompanied by a reduction in its boiler pressure from 20 to 16 kp/cm² / 284.46 to 227.57 PSI. The powdered coal firing required among other things the removal of the ash box as well as the installation of a second air compressor and an additional main air tank for pneumatic dust extraction. In addition, the locomotive was adapted to the DRs operating conditions. This included shifting the cab from the left to the right side of the locomotive as well as equipping the locomotive extensively with standard German appliances and parts. It was coupled to a type 22T34 standard design tender converted to a type 22T28 triple chamber powdered coal tender. The locomotive now designated as road number 08 1001 went first to the maintenance facility at Berlin East Station after being completed in July of 1952. Here it was scheduled to pull the D 13/14 pair of express trains to/from Stralsund with the start of the winter schedule on October 5, 1952. The records of locomotive supervisor Specht at the maintenance facility at Berlin East Station reveal the following: On October 8, the unit came early from Leipzig and hauled the D 13 to Stralsund without maintenance. Despite bad powdered coal, the steam generation was good. Like the run out, the run back also occurred without problem. Another run on October 10 also gave no cause to complain and locomotive supervisor Specht noted: Best steam generation. Bunkers 2+3 were still about 80 cm / 31 inches full on arrival in Stralsund. After transfer to the FVA in Halle in February of 1953, intensive test and measurement runs were done that resulted in many new findings. Finally, road number 08 1001 went as a kind of Christmas gift on December 24, 1953 to the Dresden-Altstadt District in scheduled use. Its maintenance intensive de-Glehn running gear, the multi-part crank axle as well as the general difficulties in procuring spare parts lead however on June 18, 1955 to it being put into storage. A refurbishment overhaul remained undone and on November 15, 1957, it was finally retired.
Here you can add your comments or message to us in modelrailworkshop
If you want to be contacted, add your email address (however, not mandatory)
Please replace the questionmarks with the left characters to know that you are not a robot.
Home
Save my proposal