Home
Detailed Search
Your proposal for improving our märklin database
Add or Overwrite the existing data and press 'SAVE MY PROPOSAL' in bottom left corner
Please be free to do all changes that you consider is needed.
MRW PHOTO
MÄRKLIN PHOTO_update
If not correct - replace the link in the below field with the correct link to the photo on www.maerklin.de
Märklin No
Märklin Article Name
Last märklin Price(RRP) Year
Last märklin € Price(RRP)
KOLL Price Book Year
KOLL € Value Estimate
Catalog Year(s)
Railway Company
Nationality
Era
Locomotive and/or Car Numbers
Text on Locomotive or Cars
Scale
Housing
Colour(s)
Length
Minimum radius
Couplers
Technology
Light
URL to www.maerklin.de
Notes
French State Railways (SNCF) TGV Duplex V 150 (train à grande vitesse) high-speed train, in the version for service and composition as a 5-part powered rail car train for the world record run on April 3, 2007. 1 powered end car (TK2), 1 transition car (R8), 1 intermediate car (R4), 1 transition car (R1), 1 powered end car (TK1). Double anti-roll shock absorbers on the trucks, powered end car TK2 without a pantograph on the roof, altered cab windows, and a one-piece hood. Only powered end car TK1 equipped with a pantograph. Powered rail car train road number 4402. The train looks as it did in 2007. Soruce: www.maerjklin.de As usual, a TGV Duplex also consists of two powered end cars and eight intermediate cars connected to each other by Jakobs trucks. The most striking feature was the new version of the powered end cars with rounded shapes, single-piece end windshield, engineers control desk arranged in the center, and improved crash protection. The aerodynamic design of the new powered end car nose and the improved transition between the cars resulted now in only a 4% air resistance at a speed of 300 km/h / 188 mph compared to a normal single-level TGV. The intermediate cars are built mostly of aluminum extrusions in order not to exceed the permissible wheelset load of 17.5 metric tons. Many other small details such as seating reduced in weight, wiring with thinner sheathing, hollow wheelset axles, and altered brake disks contributed significantly to maintaining the permissible total weight. With the beginning of the new millennium, the recognition prevailed at the SNCF that in the future TGV trains would be ordered from Alstom only with IGBT-controlled three-phase asynchronous propulsion technology and only in bi-level versions. In the summer, the SNCF ordered 55 sets of a third generation of bi-level TGV trains as the TGV Euroduplex/2N2. Here the intermediate cars underwent extensive overhauls and now offered a higher level of comfort including a modern passenger information system, accessibility for handicapped people, and wider corridors. These units (801-825, 4701-4730) are all equipped with three-system powered end cars (such as on the TGV POS). However, only the units 4701-4730 are equipped with the signal systems ERTMS-2, LZB-PZB, and Signum for service to Germany and Switzerland. The other 25 bi-level TGV trains (units 801-825) were initially given powered end cars with only the signal technical equipment for French routes. They are given priority to replace old PSE sets on routes with high-volume demand. The powered end cars are however already equipped for the installation of train safety systems for use in Germany and Switzerland as the need arises. Follow-up orders for the construction of up to 71 additional trains (units 826-896) were given by the SNCF starting in the spring of 2012, most of which were delivered recently and which are to replace the TGV Atlantique in coming years.
Here you can add your comments or message to us in modelrailworkshop
If you want to be contacted, add your email address (however, not mandatory)
Please replace the questionmarks with the left characters to know that you are not a robot.
Home
Save my proposal